Baltic states

Baltic states

Estonia, Latvia and Lithuania synchronised with the continental European grid in February 2025. That is a shared milestone; specifications, procurement and partners must still be checked country by country.

1 2 3
Market locator map
  1. Estonia
  2. Latvia
  3. Lithuania
Natural Earth · public domain. Markers indicate markets.

Destination market context

Buyers and decision-makers
Elering, AST and Litgrid are transmission reference points. For generation, identify the developer and EPC. ELWIND is an Estonian–Latvian initiative, not a Lithuanian one.
How purchasing works
Separate utility tenders, private purchasing and preliminary studies. Check TED where relevant and confirm tender status with the contracting authority.
What to check before bidding
Check technical scope, tender language, winter logistics, qualification and local commissioning capacity.
Sources and scope

Sources describe the institutional and technical context. Buyers are prospecting profiles and programmes cited do not imply open tenders.

Where to start in each country

Estonia

Start with Elering for grid work, and the ELWIND teams and contractors for studies or marine packages.

Separate preliminary scope, permitting and procurement. Determine whether the enquiry covers engineering, surveys, cables or supply.

Latvia

AST for grid work and programme teams or their engineers for offshore enquiries.

Distinguish connection and cable-route studies from future supply contracts. Identify who will procure the onshore interface.

Lithuania

Litgrid and electrical contractors for grid work; developers and integrators for plants and storage.

Identify the Litgrid procedure or the EPC engineering team sourcing connection, control or integration. Assess Lithuanian projects separately from ELWIND.

Frequently asked questions

Why assess Estonia, Latvia and Lithuania separately?

They share regional integration, but operators, contracting authorities and permits differ. Build a country-specific account and qualification list.

Which buyers should I approach? · Baltic states

Elering, AST and Litgrid are transmission reference points. For generation, identify the developer and EPC. ELWIND is an Estonian–Latvian initiative, not a Lithuanian one.

What should I verify before preparing a bid? · Baltic states

Separate utility tenders, private purchasing and preliminary studies. Check TED where relevant and confirm tender status with the contracting authority. Check technical scope, tender language, winter logistics, qualification and local commissioning capacity.

How Veltis supports you

Veltis uses experience gained in Lithuania to prioritise counterparties, arrange discussions and identify who specifies, contracts and services the package.

Discuss this market